We appreciate your interest in Orange Box Power Llc part number OB416449, which is currently ready for procurement here on Prompt Aerospace. For your reference, part number OB416449 is listed with the NSN 4730-01-607-7359 and description “Connector Hose Vent.” If this is the item you are seeking and you would like to request a quote for your comparisons, simply complete the form below with information like your desired quantity, budget, and anticipated fulfillment timeframe. We regularly respond to requests within 15 minutes of receiving them, using the details we are offered to curate the most ideal purchasing options.
Note : We Will Not Share Your Information To Any Third Parties.
If you want to explore other items produced by Orange Box Power Llc under the CAGE Code 6LGQ7 or that similarly fall under the FSC 4730 Hose Pipe Tube Lubrication and Railing Fittings, keep in mind that since we list everything with relevant information, you can easily locate related part numbers using our search engine or catalogs. We also excel at tracking down parts with long lead times or that are generally hard to find, meaning that we can serve you even if you do not see exactly what you need on our website. With all of this being said, we are ready to help you source any of the NSN 4730-01-607-7359 parts and Connector Hose Vent items your operations require, so request a quote today.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
4730-01-607-7359 Item PartTypeName: CONNECTOR,HOSE VENT | 4730 | 016077359 | 0 | N | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
OB416449 | 5 | 2 | 3 |
MRC | Criteria | Characteristic |
---|---|---|
CXCY | Part Name Assigned By Controlling Agency | VENT CYCLE CONNECTION F-B BLUE |
ABKW | Overall Height | 6.750 INCHES NOMINAL |
FEAT | Special Features | FUNCTION: THE VENT CYCLE CONNECTION IS DESIGNED ALLOW HRR CHEMICALS TO CYCLE FROM THE CHEMICAL TOTE THROUGH THE PUMPING SYSTEM AND BACK INTO THE TOTEWITH NO EXPOSURE TO MOISTURE. THIS ALLOWS HRR TO OPERATE IN A CLOSED SYSTEM WHILE HRR PUMPS ARE CHECKED AND CALIBRATED. THIS IS PARTICULARLY CRITICAL DURING COLD WEATHER OR TIMES WHEN THE SYSTEMS ARE RUNNING IN PREPARATION FOR OPERATIONS. |
MRC | Decoded Requirement | Clear Text Reply |
ABHP | Overall Length | 7.5 INCHES NOMINAL |
If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.
Request for Quote